Budget qualification
Share approximate openings, quantity, product intent, postcode and programme. Unknowns remain stated as unknowns.

For contractors and fit-out firms
Creative Loft manufactures made-to-measure internal steel and glass doors and partitions in Poland, with export and UK delivery discussed as part of the project brief.
Procurement risk
The quotation must be based on product type, openings, finishes, required performance, site readiness, delivery access and who owns installation. Missing information should be named early, not hidden inside an allowance.
The information required changes as a project moves from pricing to release.
Share approximate openings, quantity, product intent, postcode and programme. Unknowns remain stated as unknowns.
Resolve configuration, dimensions, interfaces, glass, finish, hardware and declared performance requirements.
Use approved project information and an agreed commercial and delivery scope before fabrication begins.
Responsibility matrix
The available client evidence confirms production in Poland and experience with export logistics. It does not confirm a UK survey or installation service, standard drawing workflow, unloading scope or fixed programme. These responsibilities must be stated in the quotation.
Send the latest revision and identify what is provisional.
| Workstream | Useful information | Question answered |
|---|---|---|
| Scope | Door and screen schedule, elevations, quantities and package boundary | What is being priced? |
| Technical | Openings, substrates, floor levels and declared performance needs | What must be resolved? |
| Programme | Design freeze, required-on-site date and phasing | What timing needs review? |
| Logistics | Postcode, vehicle access, delivery slot, unloading and storage | How can the package arrive? |
Contract RFQ
Add the project postcode, access notes and responsibility boundary. Creative Loft will return the questions needed to qualify a project-specific supply quotation.